| G-9 : Annualized Production & Mine Plan Farallon's G-9 mine has an economically robust mine plan with an emphasis on maximizing the potential cash flow in an market environment that values operations that are able to generate cash at low metal prices. Annualized Production Targets at G-9 are: Commercial production achieved in April 2009 Annualized Targeted Production
Targeted Annualized Production rate at 550,050 tonnes of mineralized material at average grades of 11.7% Zn, Cu 1.57%, Pb 1.23%, Ag 206.20 g/t, Au 2.95 g/t. Commercial Production was achieved on a sustained basis from March, 5, 2009. The date that commercial production commenced was April 1, 2009. The links below are the Mine Plan for the G-9 Mine
click to play
| G-9 Mine : Overview Location History of G-9 Development Production & Mine Plan Processing Marketing | ||